Execution of water supply, pumping stations and its relevant installations for the west regions of Tehran (Incl. Shahriar, Qods and Tehransar towns

PROJECT

Execution of water supply, pumping stations and its relevant installations for the west regions   of Tehran (Incl. Shahryar, Qods & Tehransar towns

CLIENT

Water & waste water company of west of Tehran

YEAR 

1998

STATUS

Completed

Project Duration

24 Month


Project specification:

The project includes water distribution and transmission lines and facilities, pumping stations, well head which has been. Implemented in electrical, mechanical and instrumentation part and new urban tissue and the old tissue and rural.

Length, size and type of pipe:

  
Splits:
 
-  about 7000 split string worn have been collected and renewal.

 - The total piping  length  is about 150 kilometers
- Polyethylene pipe sizes 63 to 200 mm.
- Ductile pipe sizes 150 to 400 mm.

- Welded steel pipe sizes 150 to 300 mm.
- Asbestos pipe size between 200 and 300 mm.